Punchlists

This guide explains how to use the Punch List feature in Oversite to track, manage, and resolve outstanding tasks on your construction projects.

Updated over 3 months ago

Overview

A Punch List is a documented list of work items that need to be completed or corrected before a construction project can be considered finished. In Oversite, the Punch List system helps you create, assign, track, and close out these items efficiently.

Key capabilities:

• Create punch list items with descriptions, due dates, and categories

• Assign tasks to managing users and contractors

• Attach photos to document issues or completed work

• Track item status (Open, In Progress, Complete)

• Group and filter items by type, category, user, or contractor

• Export punch lists to PDF or CSV for reporting and documentation

Understanding Punch List Items

Each punch list item contains the following information:

  • Description – A clear explanation of the work that needs to be done

  • Type – The classification of the task (configured by your company)

  • Category – Additional grouping for organization (configured by your company)

  • Due Date – The target completion date for the item

  • Managing User – The team member responsible for overseeing the task

  • Assigned Organization – The contractor responsible for completing the work

  • Status – Current state: Open, In Progress, or Complete

  • Attachments – Photos documenting the issue or completed work

Accessing the Punch List

To access the Punch List for a project:

  1. Navigate to the Project Group containing your project

  2. Click on the Project name to open it

  3. In the project navigation, click Punch List

The Punch List page displays all items for the selected project in a table format.

Viewing Punch List Items

Table Columns

The Punch List table displays the following columns:

  • Type – The task type classification

  • Description – Summary of the work item

  • Date Created – When the item was added

  • Due On – Target completion date

  • Category – Task category for organization

  • Images – Number of attached photos

  • Status – Current item status

Filtering and Searching

Search by description:

  1. Use the search field at the top of the table

  2. Type keywords from the item description

  3. Results filter automatically as you type

Show or hide completed items:

  1. Look for the Show Completed Items toggle

  2. Turn it On to include completed items in the list

  3. Turn it Off to show only open and in-progress items

Grouping Items

Organize your punch list by grouping items:

  1. Click the Group By dropdown

  2. Select a grouping option:

    1. Type – Group by task type

    2. Managing User – Group by assigned team member

    3. Category – Group by task category

    4. Assigned Organization – Group by contractor

  3. Items are organized under group headers

Creating a New Punch List Item

Follow these steps to add a new item to your punch list:

  1. Navigate to the project's Punch List page

  2. Click the New Item button

  3. Complete the form:

    1. Description (Required) - Enter a clear, specific description of the work needed. Be detailed enough that anyone reading it understands the task.

    2. Task Type - Select the appropriate type from the dropdown. Types are configured by your company administrator.

    3. Task Category - Select a category to help organize items. Categories are configured by your company administrator.

    4. Due Date - Click the date field to open the date picker. Select the target completion date.

    5. Managing User - Select the team member responsible for overseeing this item. Only users assigned to the project appear in this list.

    6. Assigned Organization (Optional) - Select the contractor responsible for the work. Leave blank if not yet assigned.

  4. Add Attachments (Optional)

    1. Click Add Images or drag and drop photos. Photos help document the issue that needs addressing. GPS and timestamp data from photos is automatically captured.

  5. Click Save to create the item

The new item appears in your punch list with an Open status.

Editing a Punch List Item

To update an existing punch list item:

  1. Navigate to the project's Punch List page

  2. Click on the row of the item you want to edit

  3. The edit form opens in a dialog

  4. Make your changes:

    1. Update the description, type, category, or due date

    2. Change the managing user or assigned organization

    3. Add new attachments or remove existing ones

  5. Click Save to apply changes

Updating Item Status

The status indicates the current state of work on an item:

  • Open – Work has not yet started

  • In Progress – Work is underway but not complete

  • Complete – Work has been finished

To change an item's status:

  1. Find the item in the punch list table

  2. Click the Status dropdown in the item's row

  3. Select the new status:

    1. OPEN – Mark as not started

    2. IN PROGRESS – Mark as work in progress

    3. COMPLETE – Mark as finished

  4. The status updates immediately

Deleting a Punch List Item

To remove an item from the punch list:

  1. Navigate to the project's Punch List page

  2. Click on the item to open the edit form

  3. Click the Delete button

  4. Confirm the deletion when prompted

Note:

  • Only Administrators and Project Managers can delete items

  • Items cannot be deleted if the project is locked

  • Deleted items cannot be recovered

Exporting the Punch List

Export your punch list for reporting, meetings, or documentation.

Export to PDF

  1. Navigate to the project's Punch List page

  2. Click the Export button

  3. Select PDF format

  4. The PDF includes:

    1. Project information header

    2. All visible punch list items

    3. Current grouping (if applied)

    4. Status for each item

Export to CSV

  1. Navigate to the project's Punch List page

  2. Click the Export button

  3. Select CSV format

  4. Open the file in Excel or another spreadsheet application

Understanding User Permissions

Different user roles have different capabilities:

Admin

• View punch list: Yes

• Create items: Yes

• Edit items: Yes

• Update status: Yes

• Delete items: Yes

• Export: Yes

Project Manager

• View punch list: Yes

• Create items: Yes

• Edit items: Yes

• Update status: Yes

• Delete items: Yes

• Export: Yes

Inspector

• View punch list: Yes

• Create items: Yes

• Edit items: Yes

• Update status: Yes

• Delete items: No

• Export: Yes

Note: When a project is locked, no new items can be created and existing items cannot be deleted.

Frequently Asked Questions

What is the difference between a punch list item and a daily inspection?

Daily inspections document work completed and materials placed each day. Punch list items track specific tasks that need attention, corrections, or completion. They serve different purposes but can be related—for example, an inspection might identify an issue that becomes a punch list item.

Can I assign a punch list item to multiple contractors?

No, each item can only be assigned to one contractor (Assigned Organization). If multiple contractors need to address an issue, create separate items for each contractor's scope of work.

Who gets notified when I create a punch list item?

Currently, punch list items do not send automatic notifications. You should communicate new assignments directly to team members and contractors.

Can I add punch list items from the mobile app?

Yes, you can access the punch list from any device with a web browser. The interface adapts to mobile screens, and you can upload photos directly from your device's camera.

What happens to punch list items when a project is completed?

Punch list items remain associated with the project for historical reference. You can still view and export them, but you cannot create new items or delete existing ones once the project is locked.

Can I move a punch list item to a different project?

No, punch list items cannot be moved between projects. If needed, create a new item on the correct project and delete the original (if you have permission).

How do I see all overdue items?

Sort the punch list by the "Due On" column to see items by due date. Items past their due date are overdue. You can also export to CSV and filter in a spreadsheet.

Can I bulk update multiple items at once?

No, items must be updated individually. If you need to make the same change to many items, consider exporting to CSV, making changes, and coordinating with your administrator for data updates.

What file types can I upload as attachments?

The punch list supports common image formats including JPG, JPEG, and PNG. Other file types are not currently supported.

Is there a limit to the number of punch list items per project?

There is no hard limit on the number of punch list items. However, for very large lists, consider grouping and filtering to keep the view manageable.

Troubleshooting

I cannot see the "New Item" button

• Verify you have the appropriate role (Admin, Project Manager, or Inspector)

• Check if the project is locked—locked projects do not allow new items

I cannot delete an item

• Only Administrators and Project Managers can delete items

• The project may be locked, preventing deletions

• Contact your administrator if you need an item removed

My photo upload failed

• Check that the file is a supported image format (JPG, PNG)

• Ensure the file size is not too large

• Try uploading one image at a time

• Check your internet connection and try again

Items are not showing in the list

• Check if the "Show Completed Items" toggle is turned off

• Clear any active search filters

• Try removing the group by selection

• Refresh the page

I cannot change an item's status

• Verify you have edit permissions for the project

• The project may be locked, preventing status changes